NEW DOHA INTERNATIONAL AIRPORT

Aviation Facilities

1. CP11 Cargo Main Lobby –  NDIA

Works Performed: Installation of Wood Cladding, Gypsum and Metal Tiles false ceiling, at Qatar Airways cargo main lobby.

Project Description: The works carried out included the installation of gypsum board ceiling, metal tiles and wood ceilings for the Cargo Lobby at the New Doha International Airport (Hamad International Airport).

Project Details

CONTRACTOR

Aktor S. A

DATE

MARCH 2011 - NOVEMBER 2011

PROJECT TYPE
STATUS

Completed

Project Gallery

2. CP11 Cargo Staff Lobby –  NDIA

Works Performed: Installation of Metal Tiles

Project Description: The scope of works consisted in the installation of metal tiles false ceiling, at Qatar Airways staff offices entrance.

Project Details

CONTRACTOR

Aktor S. A

DATE

JANUARY 2012 - NOVEMBER 2012

PROJECT TYPE
STATUS

Completed

Project Gallery

3. CP11 Cargo Facade & Louvers –  NDIA

Works Performed: Installation of facade and louvers, at Qatar Airways cargo

Project Description: Scope of works consisted on the installation of 2500sqm of louvers and cladding, at the Cargo building facade.

Project Details

CONTRACTOR

Aktor S. A

DATE

NOVEMBER 2010 - JUNE 2012

PROJECT TYPE
STATUS

Completed

Project Gallery

4. CP11 CARGO – FACADE LOGOS, NDIA

Works Performed: Installation of two Qatar Airways facade Logos, at cargo building.

Project Description: Installation of two Qatar Airways logos on both sides of the building, was concluded in timely manner. 240 beams (metal frames) were installed on each side as a supporting frame for the logos.

Project Details

CONTRACTOR

Aktor S. A

DATE

APRIL 2012 - JUNE 2012

PROJECT TYPE
STATUS

Completed

Project Gallery

5. CP11 CARGO – SMOKE CURTAINS, NDIA

Works Performed: Installation of Smoke Curtains, at the Cargo building of Qatar Airways.

Project Description: The scope consisted on the installation of the smoke curtains at the Cargo building, of Qatar Airways.

Project Details

CONTRACTOR

Aktor S. A

DATE

JANUARY 2011 - APRIL 2011

PROJECT TYPE
STATUS

Completed

Project Gallery

6. CP18 MAIN TERMINAL – DOORS, NDIA

Works Performed: Installation of Industrial Doors, at the Main Terminal of Qatar Airways.

Project Description: The Industrial Doors installed at the Main Terminal building, were installed in a timely manner.

Project Details

CONTRACTOR

Aktor S. A

DATE

SEPTEMBER 2011 - MARCH 2012

PROJECT TYPE
STATUS

Completed

Project Gallery