Jebel Ali Deep Tunnel
In Dubai, ADMC is taking part in the building of the Pumping Station and Sea Outfall Works for the Deep Tunnel Stormwater System. ADMC was hired by ARCHIRODON, the project main contractor, to construct in a 24/7 operation 2 Main Shafts, 60m Deep, performing 3 main activities in parallel, including installation of over 9000 Tons of reinforcement, non-stop concrete pouring, and curing of over 50,000.00 m3, and concrete repairs and finishing.
Our CEO’s continuous presence during the 24/7 slip-form operation